Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124

The zoo has opened its first full -fledged manufacturing facility, where it is expected to be able to make 10,000 robotaxis every year.
The advantage identifies the latest step in the zoo evolution outside the development phase. The company is currently examining vehicles In multiple US citiesAnd Ride of staff to offer Las Vegas and San Francisco. Public access is expected to start with an initial rider program in 2026.
The 220,000 square foot factory is located near the City City Headquarters in the California Hord. It is the second production facility of the zoo in the Gulf region, connected to the assembly warehouse of the nearby frame.
The zoo says that the new factory will be used for engineering, software and hardware integration, assembly, storage and examination. The Horder Production Facility will combine the custom-bill zoo robotaxis for multiple commercial markets starting with Las Vegas and then San Francisco. The zoo plans to roll out commercial robotaxi operations in Austin and Miami in the next few years.
The agency says that the “unique layout and building equipment” of this facility will be able to adapt to different vehicles designs as the robotaxi lineup expands in the future. The facility will be operated by a mixture of human workers and robots. Human workers will manage most of the work, The zooWhich is said that the robots will be used for certain tasks, such as applying glue for the installation of glass and transporting the robotux to the assembly line.