Meta is reportedly using actual tents to build data centers

Spread the love

Meta and Mark Zuckerberg are hurrying to create their superjection technology. Has been the organization AI researchers pochingCEO Mark Zuckerberg announced Monday that Meta was building a 5-Gigwat Data Center is known as HyperionThe

The urgent is clear. As semianlysis Report Last week and business insider Well -knownMeta is so interested in enhancing her computing power that it is literally creating tents for temporary data centers when its benefits are still under construction.

After falling behind competitors like Open, Jai and Google, Meta refuses to wait to close the interval during the general construction period – and Zuckerberg wants to increase its AI power faster.

“This design is not about beauty or unnecessary, it’s about getting a quick count online!” Semianlysis reported in his report. “From prefabricated power and cooling modules to the ultra-halka structure, the speed is the main reason (eg, no diesel generator in the eyes),” added “to” added.

As a Hyperian Data Center, Meta spokesman Ashley told Gabriel TechCrunch that it would be located in Louisia and probably 2 Gigawatt capacity by 20.

Leave a Reply

Your email address will not be published. Required fields are marked *